×

Cookie management

CEH_M3_autópálya_műtárgyai_(13 db)_Görbeháza - Nyíregyháza_hídtervezés_001.jpg

Engineering structures (13) along Motorway M3, section between Görbeháza and Nyíregyháza

General design of 13 engineering structures, total surface of 9,638 m², width ranging from 8.63 to 33.68 m, precast bridge girder superstructure bridges.

Services for this project

Related sectors