×

Cookie management

M3 Híd01.jpg

Structures of the M3 Motorway (Füzesabony – Polgár)

Under the general design coordination of UNITEF-CÉH Joint Venture, we prepared the construction designs for 25 bridges along the 60 km long motorway section between Füzesabony and Polgár. Among the bridges on this section, the approximately 250-meter-long viaduct built over the Mocsárrét area for environmental protection reasons, the six bridges crossing the Tisza floodplain, and the 404-meter-long Oszlár Tisza Bridge, whose design we coordinated as the general designer, are particularly noteworthy.

Services for this project

Related sectors