Bridge between Audi Hungária Zrt. plant zones no. G1 and G25
We have won an order for the preparation of a feasibility study for a bridge to be constructed between Audi Hungária Zrt. plant zones no. G1 and G25.
For road routing restrictions, precast beam structures have been designed to serve as access and exit bridges and a steel composite superstructure to be installed at the section with radius R = 45 m. A visualization design has also been prepared along with the bridge designs.