×

Cookie management

IMG_4235 (1).JPG

BOSCH Campus pedestrian bridge

The Bridge Office participated in the task from the beginning of the design to the end of the approval phase, but of course, we also monitored the construction planning and execution. At the beginning of the design, we examined several route options before the final location of the bridge was established. The urban environment, the area burdened with utilities, and the road conditions under the bridge posed significant challenges during the design. With a slight exaggeration, we had to find the locations for the bridge supports in a handkerchief-sized area. During the project, we worked closely with our architects, placing great emphasis on details and quality to ensure the bridge is not only functional but also aesthetically pleasing. Designing the Bosch bridge involved not only engineering but also organizational and coordination challenges. Overall, the design of the Bosch bridge was a highly complex but exciting task, resulting in a spectacular, environmentally fitting, beautiful solution.

Services for this project

Related sectors